Framing and finished pictures



We finished up the framing on the deck last Saturday. Monday we had a framing inspection because it is a low level deck. Tuesday we installed the double tiered fascia, and the deck boards. Wednesday we cut in the borders and built all the rail sections. Thursday we got rained out. Friday we finished up the railings and power washed the deck and cleaned up the jobsite

Screwed down the 5/4 cedar deck boards


Flashed the ledger board


Double tiered fascia








Cedar 2x4 railing with Fortress 3/4 round balusters,



post caps and skirts, and center squash blocks




Single picture frame border on the deck and steps
with the fascia dropped under the the border




Two levels on this deck - matching the houses, drop down living room doorwall


Four foot wide steps with tiered fascia matching the deck



All Done







We are off to Shelby Township for a Correct Deck CX composite job, I will post the design in a few days

Thank You Bayn